EasyManua.ls Logo

Samsung AM DNMDKG Series - Performing the Drainage Test

Samsung AM DNMDKG Series
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Procedure
36
English
Installation manual
Centralized Drainage without the drain pump
1 Install horizontal drainpipe with a slope of 1/100 or more and fix it by hanger space of 1.0~1.5m.
2 Install U-trap at the end of the drainpipe to prevent a nasty smell to reach the indoor unit.
100mm or more
Ceiling
Horizontal drainpipe more than 1/100 slope
Centralized Drainage with the drain pump
1 Install horizontal drainpipe with a slope of 1/100 or more and fix it by hanger space of 1.0~1.5m.
2 Install U-trap at the end of the drainpipe to prevent a nasty smell to reach the indoor unit.
Hanger
Main drainpipe
Individual
air vent
Main air vent
Centralized horizontal drainpipe
(more than 1/100 slope)
550mm or
less
1~1.5m
Performing the drainage test
1 Pour water into the base pan in the indoor unit as shown
in figure.
CAUTION
The leak test must be performed for at least 24
hours.
2 Confirm that the water flows out through the drain hose.
a. Pour about 2 liters of water into the indoor unit
drain pan.

Related product manuals