EasyManua.ls Logo

Sanwa CD731 - MEASUREMENT PROCEDURE; Start-up Inspection

Sanwa CD731
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
−35−
No problem.
Start measurement.
Short the red and
black test pins.
Set the function
switch at .
Connect the test
lead of black plug to
the COM terminal.
5MEASUREMENT PROCEDURE
5-1 Start-up Inspection
1. Never use meter if the meter or test leads are damaged or
broken.
2. Make sure that the test leads are not cut or otherwise damaged.
WARNING
Connect the test
lead of red plug to
the terminal.
START
Main unit and
test leads
damaged?
Display shows
00.001.0?
Damaged
No damage
No
Yes
Stop using it and
have it repaired.
Check continuity of
test leads.
Fig4

Related product manuals