EasyManua.ls Logo

Sanwa CD731 - MEASUREMENT PROCEDURE; Start-up Inspection

Sanwa CD731
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
−35−
No problem.
Start measurement.
④Short the red and
black test pins.
③Set the function
switch at ●.
①
Connect the test
lead of black plug to
the COM terminal.
【5】MEASUREMENT PROCEDURE
5-1 Start-up Inspection
1. Never use meter if the meter or test leads are damaged or
broken.
2. Make sure that the test leads are not cut or otherwise damaged.
WARNING
②Connect the test
lead of red plug to
the ● terminal.
START
Main unit and
test leads
damaged?
Display shows
00.0〜01.0?
Damaged
No damage
No
Yes
▼
▼
▼
▼
▼
▼
▼
▼
Stop using it and
have it repaired.
Check continuity of
test leads.
▼
▼
▼
①
②
③
④
Fig4