EasyManua.ls Logo

Sanwa PC5000 - MEASUREMENT PROCEDURE; Start-Up Inspection

Sanwa PC5000
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The buzzer sounds?
Check continuty of test
leads
Main unit
and test leads
damaged?
Set the function at " ".
[5] MEASUREMENT PROCEDURE
5-1 Start-Up Inspection
START
Short the red and black
test pins.
No damaged
No problem.
Start measurement.
Yes
Stop using it and have
it repaired.
11
1. Never use meter if the meter or test leads are damaged or
broken.
2. Make sure that the test leads are not cut or otherwise damaged.
WARNING
Damaged

Related product manuals