EasyManua.ls Logo

Sanyo MDF-U730

Sanyo MDF-U730
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Installation
1.
Remove
the
packaging
materials
and
tapes
Remove
all
transportation
packaging
materials
and
tapes.
Open
the
doors
and
ventilate
the
unit.
If
the
outside
panels
are
dirty,
clean
them
with
a
diluted
neutral
dishwashing
detergent.
(Undiluted
detergent
can
damage
the
plastic
components.
For
the
dilution,
refer
to
the
instruction
of
the
detergent.)
After
the
cleaning
with
the
diluted
detergent,
always
wipe
it
off
with
a
wet
cloth.
Then
wipe
off
the
panels
with
a
dry
©
cloth.
2.
Adjust
the
leveling
foot
Extend
the
leveling
feet
by
rotating
them
counterclockwise
to
contact
them
to
the
floor.
Ensure
the
unit
is
level.
Ml
m
Ao
ὑπ
ne
3.
Fix
the
unit
Two
fixtures
are
attached
to
the
rear
of
the
frame.
Fix
the
frame
to
the
wall
with
these
fixtures
and
rope
or
chain.
Fixture
4.
Ground
(earth)
/NWARNING
Use
a
power
supply
outlet
with
ground
(earth)
to
prevent
electric
shock.
If
the
power
supply
outlet
is
not
grounded,
it
is
necessary
to
install
a
ground
by
qualified
engineers.
Never
ground
the
unit
through
a
gas
pipe,
water
main,
telephone
line
or
lightning
rod.
Such
grounding
may
cause
electric
shock
in
the
case
of
an
incomplete
circuit.
START-UP
OF
UNIT
The
following
procedures
should
be
adhered
to
for
initial
start-up
and
continuous
operation.
1.
Connect
the
unit
to
dedicated
power
supply
and
turn
on
the
power
switch.
Do
not
put
any
product
in
the
unit
at
this
time.
2.
Set
the
desired
temperature.
3.
Confirm
that
the
chamber
temperature
is
at
the
desired
temperature.
4.
When
you
are
satisfied
that the
unit
is
working
correctly,
begin
slowly
placing
product
i
nto
the
chamber
to
minimize
the
temperature
rise.
-23-

Other manuals for Sanyo MDF-U730

Related product manuals