EasyManua.ls Logo

Sartorius IW2P1x-60FE-L - Battery-Powered Operation

Sartorius IW2P1x-60FE-L
164 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Miras 2
Miras 2
11
Assembly Procedure
1. Affix the column bracket with 4 screws
2. Install the column support leveling foot
3. Push the load cell cable into the column
4. Insert the column into the bracket holder
5. Affix the column with 2 screws
6. Insert the display and control unit retainer into the
column
7. Tighten the screw on the display and control unit
bracket
Battery-Powered Operation
To activate battery operation:
Open the battery cover at the back of the Indicator.
Insert 1.5 V size D dry-cell batteries (not included)
into the battery compartment.
The battery symbol is displayed when the unit is
operating on battery power.
If the battery symbol flashes, the battery power is
weak.
Replace the batteries (if using dry-cell batteries).
11
4
5
7
6
1
2
3

Table of Contents

Related product manuals