12
Warmup Time
To deliver exact results, the moisture analyzer must 
warm up for at least 30 minutes every time you 
connect it to AC power or after a relatively long 
power outage.
Only after this time will the analyzer has reached
the required operating temperature.
Leveling the Moisture Analyzer
 Purpose:
–  To compensate for unevenness at the place  
of installation
–  This is particularly important for testing liquid 
 samples, which must be at a uniform level in the 
sample pan
  Always level the moisture analyzer again any time 
after it has been moved to a different location.
§  Extend or retract the front and/or rear leveling feet 
as needed to adjust the moisture analyzer
Installing the Aluminum Panels (Optional;  
Part No. YDS05MA)
! To prevent burns, allow the glass panels to cool 
sufficiently before removing them
! Do not handle the aluminum panels with oily or 
greasy fingers
! Do not scratch the aluminum panels; do not use 
abrasive or corrosive substances to clean the 
 aluminum  panels
§  Remove the 2 rubber caps and the 2 screws 
beneath them, and then remove the panel retainer
§  Remove the glass panels
§  Position the aluminum panels in the retainer
§  Fasten the aluminum panels with the retainer and 
screws; replace the 2 rubber caps