INSTALLATION
LOCATION
Select a position that is reasonabl
clean and free from damp and
condensation. A minimum of 50mm clearance is re
uired above and
below the controller to allow for wirin
. Ambient temperature limits
should be within 0 to 50
°
C
For mountin
instructions see MLI 2.10/2.951, as supplied with the
controller.
MLI 2.10P is supplied with the Touch-screen panel mountin
kit.
DO NOT SWITCH ON THE POWER SUPPLY UNTIL
COMMISSIONING PROCEDURES HAVE BEEN CARRIED
OUT.
To avoid inadvertent dama
e, it is recommended that the
24 Volt suppl
fuse is removed from the control panel and refitted
after the site wirin
and commissionin
have been completed.
COMMISSIONING
See also DS 5.00A for full details of commissionin
the Satchnet
s
stem.
1. Ensure the IAC controller has no mains Volta
es connected to
an
of its terminals before an
commissionin
checks are carried
out.
2. Refer to the s
stem dia
ram and check that all wirin
is correctl
connected to the terminal blocks.
3. Ensure IAC terminal 2 is earthed.
4. Check that the terminal sockets are correctl
ali
ned with the
terminal plu
s on the IAC.
5. If an
Input or Output wirin
is
reater than 100 metres lon
ensure it is screened. The screen should be earthed onl
at the
IAC controller usin
one of the earth terminals supplied
DO NOT
USE AN ISOLATED GROUND
.
6. Ensure that the serial link connections are screened. LAN A and
LAN B screens must be connected to a verified
ood earth ONLY
at the computer/MIU. LAN A and LAN B screens should be
connected to the IAC isolated
round terminals of each IAC on
the LAN
DO NOT USE THE IAC EARTH TERMINALS
. See fi
s
12 to 15 for details.
7. If a Touch-screen is to be used ensure it is plu
ed in before
appl
in
power to the IAC.
8. GENERAL:- Do not connect/disconnect an
input, output, LAN or
Touch-screen with the power connected as this could dama
e the
LAN.
9. Disconnect all outputs to the plant. Replace the 24Vac suppl
fuse.
10.Set the correct preset application for the s
stem
see fi
. 5, pa
e
19 for confi
uration details. If the confi
uration is to be loaded
from computer then select preset 0
software preset
on the bit
switch.
11.If a Touch-screen is fitted, check that the address is set correctl
,
see the Touch-screen User Guide for details.
12.Set the correct address for the IAC
see fi
. 6, pa
e 19 for settin
details
.
13.Remove the 24Vac fuse and re-connect all the outputs to the
plant. Replace the 24Vac suppl
fuse.
14.Confi
ure the IAC from a computer runnin
ver 6.11
or later
Satchnet Networkin
Software. See confi
uration details startin
on pa
e 3.
DS 2.951A 2 - 24 05/98