3
CONTENTS
¬¬
MOUNTING THE UK - BLOCKING AND SCREW 29
¬¬
TECHNICAL DATA 4
Installation 4
Safety 4
The Clean Air Act 1993 and Smoke Control Areas 4
Technical data and dimensions 5
Dimension sketch and minimum distances 6
Type plate 8
Product registration umber 8
¬¬
ASSEMBLY 9
Tools for the mounting of the woodburning stove 9
Loose parts 9
Additional accessories 9
Disposal of packaging 9
Fresh air intake 9
Closed combustion system 10
Existing chimney and pre-fabricated element chimney 10
Connection between stove and steel chimney 10
Requirements for chimney 11
Positioning the stove at a non-flammable wall 11
Distance to furniture 11
Safety distance 11
Removal of the stove from the pallet 12
Door (Self-closing) 12
Height adjustment of stove 13
Fitting the flue connection piece 14
Heat-storage system 16
Load-bearing foundation 17
Floor plate 17
¬¬
INSTRUCTIONS FOR USE 18
CB-technology (Clean Burn) 18
Baffle plate 18
Ash container 18
Primary air 18
Secondary air 18
Adjustment of primary- and secondary air 19
¬¬
INSTRUCTIONS FOR HEATING 20
Environmentally friendly operation 20
Lighting 20
”Top down” lighting 20
Continuous operation 21
Warning about over-firing 21
Using the stove in various weather conditions 22
Firing in the spring or autumn 22
The function of the chimney 22
Chimney fire 22
General notes 22
¬¬
HANDLING OF THE FUEL 23
Selecting wood/fuel 23
Preparation 23
Storing 23
Moisture 23
Use of the following as fuel is illegal 23
Calorific value of the wood 23
¬¬
MAINTAINANCE 24
Sweeping the chimney and cleaning the stove 24
Checking the stove 24
Servicing 24
Combustion chamber lining 24
Gaskets 24
Painted surfaces 24
Cleaning the glass 25
Removing the baffle plate and the baffle unit 25
Disposal of stove parts 26
¬¬
TROUBLESHOOTING 27
¬¬
WARRANTY 28