EasyManua.ls Logo

Scanjet SC 45TW - Calculation of Cleaning Time

Scanjet SC 45TW
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
#SC 45TW-SS 10 110202 Page 13 of 40
6.2. Calculation of Cleaning Time
Calculation of cleaning time for a full cycle
The cleaning time depends of the following:
Rotation speed of the main housing
A (rev./min.)
Number of rotations for full pattern
47 (turns)
Cleaning time
D (minutes)
Cleaning time D =
47
A
Example 1: The main body rotates with 2,5 turns per minute (checked with a
wristwatch when looking at the machine). How long time does it take to create
a first cleaning pattern in the tank?
A = 2,5 rev/min
A first pattern is created after 1 cycle!
Cleaning time D =
47/2.5
4
= 4.7 minutes
Note that after an additional 4 x 4.7 = 18.8 minutes a full cleaning pattern will
be created.

Related product manuals