6.4 Inspection of the gas cooler
The fan reaches the specified flow rate by rotating in a specific direction as indicated on the unit.
The air flow must never be obstructed. Cooling air must never be contaminated; avoid intake from
pollutant industrial facilities or from manure yards/slurry or intensive cattle breeding centres,
sources of ammonia pollutants.
6.5 Earth connection
The unit must be connected to the ground line, using the terminal provided by the constructor
before the unit is turned on for the first time after installation. The customer is responsible for the
connection and the efficient grounding in conformity with current legislation in force and for
periodically checking the state of the same.