EasyManua.ls Logo

Seagull Models CESSNA 152 - Engine Mount and Fuel System Preparation; Engine Mount Installation

Seagull Models CESSNA 152
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WWW.SEAGULLMODELS.COM
77
.
.
Epoxy
Rudder control horn.
ENGINE MOUNT INSTALLATION.
1) Locate the items necessary to install the
engine mount included with your model.
4x30 mm
2) Use four 4x30mm head bolts and four
4mm washers to attach the engine mount
rails to the rewall. Tighten the screws .
Make sure to use threadlock on the screws to
help prevent them from vibrating loose.
read locker glue.
INSTALLING THE S TOPPER
ASSEMBLY
1) Using a modeling knife, carefully cut o
the rear portion of one of the 3 nylon tubes
leaving 1/2” protruding from the rear of the
stopper. is will be the fuel pick up tube.
2) Using a modeling knife, cut one length of
silicon fuel line. Connect one end of the line
to the weighted fuel pick up and the other
end to the nylon pick up tube.

Related product manuals