EasyManuals Logo

SeeedStudio C Series User Manual

SeeedStudio C Series
33 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
LinkStar-H68K-C D F Model Routing - Quick
Start Guide
Full
text
Document version
20220901
9
2.4
Broadband dial-up routing and network allocation
methods
The C D version is recommended for the first level of routing to the home network,
in the weak box, without WIFI.
2.4.1
Device connection topology diagram
2.4.2
Distribution methods
Step 1: Connect the wire sequence
Conne
ct the wire sequence as shown in the topology diagram above. Connect the incoming
optical cat or incoming network port to ETH0 (WAN port).
Step 2: Back Office Login
The H68K wa
its for a successful power-up, the PC PC cable is connected to the ETH1 (LAN
port) and the H68K is wired to access the H68K backend.
Step 3: Set up PPPOE dialing
Click
on the [Network] button, click on the [Interface] button and click on [Modify] at the
WAN port
Translator: GitHub@IcingTomato

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SeeedStudio C Series and is the answer not in the manual?

SeeedStudio C Series Specifications

General IconGeneral
BrandSeeedStudio
ModelC Series
CategoryNetwork Hardware
LanguageEnglish