EasyManua.ls Logo

Sega The Maze of the Kings - Inspections Immediately After Transporting The Product To The Location

Sega The Maze of the Kings
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
1.1. INSPECTIONS IMMEDIATELY AFTER TRANSPORTING THE PRODUCT
TO THE LOCATION
· Only QUALIFIED SERVICE PERSONNEL should carry out inspection.
Normally, at the time of shipment, SEGA products are in a state to allowing usage immediately after
transporting to the location. Nevertheless, an irregular situation may arise during transportation preventing
this. Before turning on the power, check the following points to ensure that the product has been transported
safely.
· Are then any dented parts or defects (cuts, etc.) on the external surfaces of the product.?
· Are castors and leg adjusters present and undamaged?
· Do the power supply voltage and frequency requirements meet with the local supply?
· Are all wiring connectors correctly and securely connected? Unless connected in the correct direction,
connector connections cannot be made successfully. Do not insert connectors forcibly.
· Are all IC’s of each IC BD firmly inserted?
· Does the power cord have any cuts or dents?
· Do fuses meet the specified rating?
· Are such units such as monitors, control equipment, IC BD, etc. firmly secured?
· Are all earth wires connected?
· Are all accessories available?
· Can all doors and lids be opened with the accessory keys and/or tools?

Table of Contents

Related product manuals