EasyManua.ls Logo

Seli STS-03 - 4 Installation; Preparing the System; Mechanical Connection

Seli STS-03
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53
14 Installation
14.1 Preparing the system
Please make sure that
there is enough working space for operating the sensor.
the process is shut down.
tanks or pipelines are depressurised, empty, and clean.
connection nozzle and process connection of the sensor are
matching.
14.2 Mechanical connection
Risk of injuries due to escaping process fluid!
Burns or chemical burns depending on the properties of the
process fluid.
Wear safety goggles and protective clothing!
Check that the tank or the pipeline the sensor is connected to is
depressurised, empty, and clean!
Insert the sensor into the matching modular process connection
(modular@process see also chapter 10 Spare parts and
accessories).
Tighten the pressure screw (1) to a torque of maximum 10Nm.
1 pressure screw
DANGER!

Table of Contents