EasyManua.ls Logo

Seli STS-03 - Keylock

Seli STS-03
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
67
17 Maintenance
17.1 Important maintenance instructions
Please make sure that maintenance work is only performed by
authorised and trained personnel.
Establish a maintenance schedule that is aligned with your
process!
Always perform the maintenance work wearing suitable protective
clothing.
Only perform maintenance or repair work that is described in the
operating instructions!
Structural modifications must only be implemented upon
consultation with the manufacturer.
Before disconnecting the sensor from the process, the pipelines or
tanks must be depressurised, empty, and clean.
17.2 Checking the process connection
The pressure screw (1) holds the sensor in the process nozzle and
seals the sensor.
Check the process connection for leakages at regular
intervals.
If required, tighten the pressure screw (1) to a maximum
torque of 10Nm.
1 pressure screw

Table of Contents