1.3. Parts List
Tools Required
• Electrical Tools: wire stripper, wire nut, insulation tape
• Mechanical Tools: spirit level, anchor plate J bolt, driver set
For Pedestal leveling
- 3/8” inch wrench
- key size 3 (metric)
- key size 10 (metric)
- Key size 3 (metric)
- Key size 2 (metric)
SemaConnect Parts List:
1) Station Head Unit with J1772 Cable (20ft)
Single pedestal: Qty 1 / Dual pedestal: Qty 2
2) Single Pedestal|
Single pedestal: Qty 1 / Dual pedestal: Qty 0
3) Dual Pedestal|
Single pedestal: Qty 0 / Dual pedestal: Qty 1
4) Head Unit Mounting Screws (M5×10)
Installation Manuals Series 6 EV Charging Station - 1
Copyright ©2021 SemaConnect, Inc. All rights reserved. Page 4 of 25