EasyManua.ls Logo

Sharp LC-60EQ10U - Precautions for Assembly (LC-60;70 EQ10 U;SQ10 U,15 U,17 U)

Sharp LC-60EQ10U
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LC-60/70EQ10U,SQ10U/15U/17U,TQ15U,UQ17U
4 – 14
[4] Precautions for assembly (LC-60/70EQ10U/SQ10U,15U,17U)
1. Points to be checked and precautions when servicing the unit
Mount the main PWB Ass’y on the backlight chassis and check that the EMI-prevention parts are not peeled and twisted from the access holes. (The
EMI-prevention parts, conductive nonwoven fabric gaskets, must be seen from the access holes.)
[Countermeasure]
Attach the conductive nonwoven fabric gaskets on the shielded case on the main PWB.
LC-60EQ10U/SQ10U,15U,17U
Back side
(1) Prepare ***
LAN GKD145WJFW
TE RM ANG SIDE
(2) Stick ***
PSPA Z C6 90WJZ Z
CONDUCTR:8x 255
Positioni ng
Posit io ning
Back side
Positioning
Pos itionin g
(1) Prepare ***
LAN GKD146WJFW
TE RM ANG BOTTOM
(2) Stick ***
PSPA ZC691 WJZZ
CONDUCTR:8x180

Table of Contents

Other manuals for Sharp LC-60EQ10U

Related product manuals