EasyManua.ls Logo

Shini CD SERIES - Maintenance Schedule; About the Machine; Electrical Installation; Daily Checking

Shini CD SERIES
44 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44(44)
6.1 Maintenance Schedule
6.1.1 About the Machine
Model SN Manufacture date
Voltage Ф V Frequency Hz Power kW
6.1.2 Electrical Installation
Voltage: V Hz
Fuse melt current: 1 Phase A 3 Phase A
Check phase sequence of the power supply.
6.1.3 Daily Checking
Check power supply wires.
Check the start/stop function.
6.1.4 Weekly Checking
Check the switches of the machine.
Check all the electrical wires.
Check the pipe heater.
Check motor overload relay.
6.1.5 Monthly Checking
Check the switches and automatism on-off of the machine.
Check the pipe heater.
Check if there are loose electrions.

Table of Contents

Related product manuals