33(33)
6.3 Maintenance Schedule
6.3.1 About the Machine
Model SN Manufacture date
Voltage Ф V Frequency Hz Power kW
6.3.2 Installation & Inspection
Check if the suction pipe has been correctly connected.
Check if that pipe clips is secured.
Check if mounting base is secured.
Electrical Installation
Voltage: V Hz
Fuse: One-phase: A Three-phase: A
Check power phase.
6.3.3 Daily Checking
Check main power switch.
Check filter
Check working status of the blower.
6.3.4 Weekly Checking
Check all the electrical cables.
Check if there are loose connections of electrical components.
Check the screw of the base is secured.
Check the air filter.
6.3.5 Monthly Checking
Check the spring lock on the hopper cover is loosed or not.
Check the hopper flap is deformed or not.
Check the performance of magnetic proximity switch/photoelectrical sensor.