38(65)
3. Installation and Debugging
3.1 Installation Space
During installation of the machine, keep at least 500mm installation space
around the machine as shown by the picture. Do not install the machine in a
position crowded with other objects. This would cause inconvenience to
operation, maintenance and repair.
Do not sit on the machine.
Keep away flammable and explosive goods.
Picture 3-1:Installation Space
3.2 Mould and Water Coupling
1) It is necessary, while connecting from the access to mould, to use two
spanners to fix the switching connection and ball valve before screw tightly
the horn nut of the connection pipe, otherwise water might leaks from the
machine.
Picture 3-2:Mould and Water Couplings 1