EasyManua.ls Logo

SICK FWE200DH

SICK FWE200DH
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
8024019/AE00/V1-0/2019-02| SICK A D D E N D U M T O O P E R A T I N G I N S T R U C T I O N S | FWE200DH
Subject to change without notice
REPAIR WORK 6
6 Repair work
6.1 Replacing the WBP control block
If there is a defect in the components of the WBP control block, it must be completely
replaced.
WBP control block, Part No.: 2106005
Fig. 23: WBP control block
Worksteps to replace the WBP control block:
Turn the water off.
Disconnect water hose on pressure reducer
.
Disconnect water hoses from solenoid valves
.
Disconnect solenoid valve plugs
.
Loosen two separator nuts
. Remove the complete WBP control block.
Fit the new WBP control block in reverse sequence.
Make sure the plugs of the solenoid valves and water hoses are connected in the correct
connections. The connections are color coded to simplify this.
NOTE:
Repair work may only be carried out by trained personnel. Put on personal protective
equipment according to the potential danger.
Pressure reducer
Solenoid valves
Solenoid valve connectors
Separator bolts

Related product manuals