EasyManua.ls Logo

SICK PBS Series

SICK PBS Series
96 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Instructions PBS
28 ©SICKAG•Germany•Allrightsreserved•Subjecttochangewithoutnotice8013154/U275/2010/02/01
6. Packaging / 7. Starting, operation
6. Packaging
Has everything been supplied?
Checkthescopeofsupply:
Completely assembled pressure switches
Ordered accessories
Inspect the pressure switch for possible damage during transportation. Should there be any
obviousdamage,informthetransportcompanyandSICKwithoutdelay.
Keep the packaging, as it offers optimal protection during transportation (e.g. changing
installation location, shipment for repair).
Ensure that the pressure connection thread and the connection contacts will not be
damaged.
7. Starting, operation
Requiredtools:wrench(ats27),screwdriver
Diaphragm test for your safety
Itisnecessarythatbeforestartingthepressureswitchyoutesttheinstrumentvisual,asthe
diaphragm is a safety-relevant component.
Pay attention to any liquid leaking out, for this points to a diaphragm damage.
Use the pressure switch only if the diaphragm is undamaged.
Use the pressure switch only if it is in a faultless condition as far as the safety-
relevantfeaturesareconcerned.
Warning

Related product manuals