Commissioning
7
7.1 Chapter overview
Chapter overview
In this chapter you will nd checklists for commissioning the FM 450-1. These checklists enable
you to
• check all working steps up to full operation of the module,
• avoid operating faults by the module.
7.2 Working steps during mechanical installation
Check list
Use the following checklist to check and document the working steps during mechanical
installation of the FM 450-1.
Working step Options/procedure (X)
Dene the slot All slots that are not already occupied or due to be occupied by a power supply module, a
CPU or an IM.
Install the FM 450-1
1. Hook FM into position and screw tight
2. Attach slot number
Select cables Observe rules and specications in chapter "Wiring (Page 25)".
Counter module FM 450-1
Equipment Manual, 03/2022, A5E03648739-AC 47