EasyManua.ls Logo

Siemens LMV51.100B2 - Page 7

Siemens LMV51.100B2
299 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7/301
Siemens Building Technologies Basic Documentation LMV5... CC1P7550en
HVAC Products 13.08.2004
− Self-setting of control parameters (adaption)........................................76
− Adaption sequence ...............................................................................76
− Checking the control parameters..........................................................77
− Example ............................................................................................77
− Settling of the manipulated variable...................................................... 78
− Principle ............................................................................................78
− Description (graph)............................................................................78
6.4.3 Multistage control ..........................................................................................79
− General ................................................................................................. 79
− Load-dependent activation of the higher burner stages .......................79
− Function diagrams ................................................................................ 80
6.5 Actual values (X) ...........................................................................................81
− Input 1, TEMP, Pt100 sensor (DIN) X60...............................................81
− Input 2: TEMP. / PRESS INPUT, DC 0...10 V / DC 2...10 V / 4...20 mA
X61 .......................................................................................................81
− Measuring range temperature (can be parameterized)..................... 81
− Measuring range pressure (can be parameterized) ..........................81
− Input 4: TEMP, Pt1000 / LG-Ni 1000 X60.............................................82
6.6 Setpoints (W).................................................................................................83
− Internal setpoint .................................................................................... 83
− Input 3: SET POINT INPUT X62........................................................... 83
− External predefined setpoint .............................................................83
− External predefined load ...................................................................83
− External predefined load, modulating................................................83
− External predefined load, multistage.................................................84
− External setpoint changeover............................................................ 84
− External setpoints or predefined load via digital modbus / e-bus
interface ................................................................................................84
6.7 Integrated temperature limiter function..........................................................85
− TL within the scope of TRD ..................................................................85
− TL with external predefined load...........................................................85
− Requirements placed on sensor and protection pocket........................85
6.8 Cold start thermal shock protection (CSTP) .................................................. 86
6.8.1 CSTP – modulating operation .......................................................................86
6.8.2 CSTP – multistage operation.........................................................................87
6.8.3 CSTP with temperature sensor in pressure plants ........................................ 87
6.9 Output............................................................................................................88
6.9.1 Output 4...20 mA ...........................................................................................88
− Output, modulating ...............................................................................88
− Output, multistage.................................................................................88
6.10 Multiboiler plants............................................................................................ 88
6.10.1 Multiboiler plants by means of an analog input .............................................88
6.10.2 Multiboiler plants by means of a digital interface...........................................88
7 Display and operating unit AZL5... ............................................................89
7.1 Assignment of AZL5… terminals ................................................................... 90
− Connecting cable to the e-bus adapter.................................................91
− Connecting cable to the PC ..................................................................91
7.2 Ports of the AZL5….......................................................................................92
7.2.1 Port for the PC...............................................................................................93
7.2.2 Connection to superposed systems ..............................................................94

Table of Contents