EasyManua.ls Logo

Siemens Sentron 3VA - Page 374

Siemens Sentron 3VA
492 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Accessories
4.11 Test devices
3VA molded case circuit breakers with UL and IEC certification
372 Manual, 01/2019, L1V30435333-01
Carry out a meter test
The purpose of the meter test is to determine whether the ETU is measuring and displaying
current correctly. A test current of 0.4 x I
rated
is fed into the ETU. The current value measured
by the ETU is then checked to confirm that it matches the test current.
Note
The molded case circuit breaker does
not
need to be switched to position "ON" for this test.
Execute the test
1. Connect the TD500 test device to the 3VA6 molded case circuit breaker.
2. Press the pushbutton labeled <METER>
.
The LED in the <METER> pushbutton begins to flash. The test takes approximately
30 seconds.
3. Wait until the LED in the pushbutton <METER> changes from flashing to steady
illumination.
The test is completed.
4. Evaluate the test result by the status of the LED labeled "RESULT":
LED "RESULT" is
illuminated steadily in green: The test was successful
.
LED "RESULT" flashes
red: The test was unsuccessful
and must be repeated
.
If the test
fails again, contact
Technical Support (Page 10) .
5. Press the pushbutton <METER> again in order to confirm the test result and restore the
TD500 to its initial state.
Test transformers
This procedure tests the transformers (energy transformer or Rogowski coil) to determine the
following:
Are transformers installed in the ETU?
Are transformers correctly installed in the ETU?
Are the installed transformers functioning correctly?
Note
In order to carry out this test, it is absolutely essential to disconnect all external power
supplies (e.g. EFB300, COM800, COM100, 24 V module) to the electronics.

Table of Contents

Related product manuals