Commissioning the device   
4.3 Parameter assignment for Comfort Panel 
  Comfort Panels 
142  Operating Instructions, 07/2017, A5E36770603-AB 
 
Load project from external storage medium 
This function is available in connection with an HMI device image that is compatible with 
WinCC (TIA Portal) V14 or higher. 
You can use this function to load a project that was backed up to a storage medium in 
WinCC (TIA Portal) into the HMI device. 
You generate the necessary project data in WinCC by configuring the HMI device and then 
using drag-and-drop to move the folder of the HMI device (e.g. "HMI_1 [<
DeviceType
>]") to 
an external storage medium (  icon) under "Card Reader/USB memory".  
Recommendation: The Runtime and firmware versions of the project should match those of 
the HMI device. 
●  You have opened the "Load Project" tab in the "Service & Commissioning" dialog with the 
"Service & Commissioning" icon. 
 
●  The storage medium with the backed up project is inserted in the HMI device.