EasyManua.ls Logo

Siemens SIMOTICS S-1FK7 - Page 76

Siemens SIMOTICS S-1FK7
134 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting
5.4 System integration
1FK7 G2 synchronous motors
74 Operating Instructions, 05/2021, A5E50907562B AA
Additional grounding
Required parts
Grounding clip (included in the scope of supply)
1
Grounding clip (included in the scope of supply)
Procedure
Note
Ensure a good conductive connection.
Connect the ground connection to the supplied grounding clip.
Installing the disassembly protection sleeves for the M23 or M40 power connectors and signal
connectors (round connectors)
To prevent autonomous and inadvertent loosening of the cable connection, and to ensure an
adequate grounding, install disassembly protection sleeves.
Required parts
Disassembly protection sleeves according to connector size
Cylinder head screw for M23 connector: M4 x 35, property class 8.8
Cylinder head screw for M40 connector: M5 x 60, property class 8.8
M4 or M5 nut

Table of Contents

Related product manuals