Commissioning
4.2 Commissioning with BOP-2 operator panel
SINAMICS G120C, FSD ... FSF inverters
74 Compact Operating Instructions, 11/2016, FW V4.7 SP6, A5E39339884B AA
SI F-DI changeover, tolerance time (processor 2)
p9851 SI STO debounce time (processor 2) [μs]
SI common functions (processor 2)
r9872 CO/BO: SI status (Power Module)
SI actual checksum SI parameters (processor 2)
p9899 SI reference checksum SI parameters (processor
Runtime group sampling time [ms]
BI: AND 1 inputs → same as p20030
AND 1 runtime group → same as p20032
BI: AND 2 inputs → same as p20030
p20040 AND 2 runtime group → same as p20032
BI: AND 3 inputs → same as p20030
AND 3 runtime group → same as p20032
BI: OR 0 inputs → same as p20030
OR 0 runtime group → same as p20032
BI: OR 1 inputs → same as p20030
OR 1 runtime group → same as p20032
BI: OR 2 inputs → same as p20030
OR 2 runtime group → same as p20032
BI: OR 3 inputs → same as p20030
OR 3 runtime group → same as p20032
BI: XOR 0 inputs → same as p20030
XOR 0 runtime group → same as p20032
BI: XOR 1 inputs → same as p20030
XOR 1 runtime group → same as p20032
BI: XOR 2 inputs → same as p20030
XOR 2 runtime group → same as p20032
p20074 BI: XOR 3 inputs → same as p20030
XOR 3 runtime group → same as p20032
BO: NOT 0 inverted output
p20080 NOT 0 runtime group → same as p20032
BO: NOT 1 inverted output
NOT 1 runtime group → same as p20032
BO: NOT 2 inverted output
NOT 2 runtime group → same as p20032
BO: NOT 3 inverted output
NOT 3 runtime group → same as p20032