2.4 Insulation test
The insulation resistance is measured before and after the high-voltage test. The insulation test
can only be ordered and carried out together with the function test (F72, F73).
Insulation test Order codes
Without the
customer
present
With the cus‐
tomer
present
High-voltage test
Measuring the insulation resistance
F76
F77
The successful test is confirmed in a 3.1 certificate – or in the case that the customer has
ordered the acceptance test, in a 3.2 certificate.
See also
Insulation test (Page 30)
The insulation test is performed on a separate acceptance day prior to the function test.
General scope of services
2.4 Insulation test
SINAMICS SL150 6SL3865 F03 F70 F98 F79 F76
14 Reference Manual Rev.201902141427 SL150 wassergekühlt

Other manuals for Siemens SINAMICS SL150

Related product manuals