Checkout procedure
When the 4100 NIC installation is completed, verify its operation using the Network Programmer’s Reports. In addition, do the following:
• Test point status changes
• Test common annunciation
• Interrogate the network about point information
• Test common trouble point status reports and responses
Use Version 7.03 (or later) of the 4100 Programming Unit to make any corrections to the network CFIG chips. (Refer to Publication NET-41-003 for
programming information.)
page 31 579-182 Rev. V
4100/4120-6014, 4100-6078 NICs and 4100/4120-Series Media Modules Installation Instruction