EasyManuals Logo

Skyjack SJ12 Operating Manual

Skyjack SJ12
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
Visual & Maintenance Inspection Section 2 - Familiarization
It is the responsibility of the operator to read, completely understand and follow all instructions and warnings
contained in this operating manual and on the aerial platform.
FAMILIARIZATIONFAMILIARIZATION
2.3-5 Base
Main Power Disconnect Switch
- Turn main power disconnect switch to
” off position.
- Ensure all cables are secure and switch is
in proper working condition.
Base Control Switches
- Ensure there are no signs of visible
damage and all switches are in their
neutral positions.
Battery Charger
- Ensure charger is secure and shows no
visible damage.
Pothole Protection Device
- Ensure mechanisms have no sign of
visible damage and are free from dirt and
obstructions.
Wheel/Tire Assembly
The aerial platform is equipped with solid
rubber tires. Tire and/or wheel failure could
result in an aerial platform tip-over. Component
damage may also result if problems are not
discovered and repaired in a timely fashion.
- Check all tire treads and sidewalls for cuts,
cracks, punctures and unusual wear.
- Check each wheel for damage and
cracked welds.
- Check each lug nut for proper torque to
ensure none are loose.
- Check wheel motor assembly for loose or
missing parts and signs of visible damage.
- Ensure wheels are aligned and true
vertically and horizontally.
WARNING
Intermixing tires of different types or using
tires of types other than those originally
supplied with this equipment can adversely
affect stability. Therefore, replace tires only
with the exact Skyjack-approved type.
Failure to operate with matched approved
tires in good condition may result in death
or serious injury.
Main Power Disconnect Switch
Base Control
Switches
Battery Charger
Pothole Protection
Device
Wheel/Tire Assembly
Page 18
Vertical Mast
TM

Other manuals for Skyjack SJ12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ12 and is the answer not in the manual?

Skyjack SJ12 Specifications

General IconGeneral
Gradeability25%
Drive Motor24V DC
Machine Width32 in (0.81 m)
Stowed Height6.5 ft
Overall Width32 in (0.81 m)
Stowed Height (Rails Folded)6.5 ft
Drive Speed (Elevated)0.5 mph (0.8 km/h)
Power SourceElectric

Related product manuals