EasyManua.ls Logo

SMA SUNNY ISLAND 6048-US - Initial Start-Up of the Multicluster System

SMA SUNNY ISLAND 6048-US
240 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SMA America, LLC 16 Multicluster Operation
Technical description SI4548_6048-US-TB_en-13 145
16.2 Initial Start-Up of the Multicluster System
1. Perform steps 1 to 3 of the QCG start (see Section 8.2 "Starting the Quick Configuration Guide
(QCG)", page 67).
2. At "New System" set the following parameters:
– Device type (master, slave 1, slave 2, slave 3)
– System configuration (3Phase, 1Phase 1, 1Phase 2, 1Phase 3, 2Phase 2, 2Phase 4,
MC-Box), for multicluster operation choose "MC-Box". Default setting: "1Phase 1"
– Multicluster configuration (MainCluster, ExtensionClst1, ExtensionClst2, ExtensionClst3),
default setting is "MainCluster"
– Device type of the Multicluster Box (MC-12), default setting: "MC-Box-12"
3. For further settings, follow the QCG instructions (see Section 8.2 "Starting the Quick
Configuration Guide (QCG)", page 67).
Possible load shedding during initial start-up of a multicluster system
Unwanted load shedding can occur during the initial start-up of a multicluster system. The
possible causes of this can be a too-low state of charge of the battery or a still too inaccurate
charge level calculation in the Sunny Island.
• Disconnect all loads before the initial start-up of a multicluster system.
• After initial start-up, observe the SOC on the master of the main cluster via the parameter
"120.01 BatSoc". As soon as the SOC has risen above 50%, connect the loads.

Table of Contents

Other manuals for SMA SUNNY ISLAND 6048-US

Related product manuals