19 Parameter Lists SMA Solar Technology America LLC
162 SI4548-6048-US-BE-en-21 Operating Manual
19.1.3 External Meters (130#)
131# Total Meters
132# Grid State
09 RmgTmEqu Remaining time until
next equalization
charge in days
10 AptPhs Status of the
absorption phase
Off (1) Absorption phase not active
On (2) Absorption phase is active
11 BatSocErr Estimated error of the
state of charge in %
Estimated error of the displayed
state of charge in relation to the
actual state of charge of the
battery in percent (e.g. +/
−3%).
12 BatCpyThrpCnt Nominal energy
throughputs of the
battery
No. Name Description
01 TotExtPwrAt Total active power of the external source in kW
02 TotExtCur Total current of the external source in A
03 TotExtPwrRt Total reactive power in kVAr
04 TotLodPwr Total average active power of the loads (cluster) in kW
05 TotMccLodPwr Total average active power of the loads (Multicluster) in kW
No. Name Description
01 GdRmgTm Remaining time of parameter "GdValTm" in hours, minutes and seconds
No. Name Description Value clear
text (No.)
Explanation