SMA Solar Technology AG 10 Troubleshooting
Operating Manual SI80H-BE-BEN120810 57
6. Confirm the question Setup new cluster ? with Y.
7. Wait until the inverter LED of slave 1 flashes and the Sunny Remote Control shows the message
To identify Slave1 press Tss on the Slv.
8. Press the start-stop button at slave 1.
The QCG configures slave 1.
To configure slave 2, wait until the inverter LED of slave 2 flashes and the Sunny Remote
Control shows the message To identify Slave2 press Tss on the Slv.
Press the start-stop button on slave 2.
A signal sounds and the QCG configures slave 2.
9. Press the button. This closes the QCG.
The off-grid inverter switches into standard mode.
Changing the Slave Addresses Without a Sunny Remote Control
Only use this method if no Sunny Remote Control can be connected.
Requirement:
There is no Sunny Remote Control connected to the cluster.
1. Switch the off-grid inverters on.
The off-grid inverters are in standby mode.
2. Press and hold the activation button on the master
until a signal sounds three times.
The cluster is restarted and the LEDs on the off-grid
inverters in the cluster flash.
3. In a one-phase system, press the activation button repeatedly until one LED flashes.
4. In a three-phase system, push the activation button repeatedly until all three LEDs flash.