Smappee Infinity – Installation manual – English
9. Validation of the installation
Once the installation is complete, it is good practice to validate the correct operation of the
monitoring solution.
You should check that all CTs are operational and measuring the correct power values. If loads are
being measured, this does not automatically mean that the power values are correct. Incorrect line
voltage and current mapping could lead to incorrect power values and wrong monitoring data.
To check the correct operation of the Smappee Infinity, Smappee provides real-time values of all
measured loads. You can access these real-time values with the mobile app or via the Smappee
Dashboard.
There are two options for visualising real-time values:
1. The Smappee App reports real-time active power values for each input individually.
2. The Smappee Dashboard reports real-time the active and reactive power, line & phase
voltage, power factor, and current of each input: https://dashboard.smappee.net – see Live
electricity values card.
Real-time values in the Smappee App: go to Settings > Your Smappee monitors > Load
Configuration. Tap a specific load to get a more details.
The details of each measured load, such as the used CT Hub input and the phase mapping
properties, are accessible under Load Configuration in the Smappee App.
Select in the Smappee App Settings > Your Smappee Monitors > Load Configuration.
Real-time values in Smappee Dashboard: Go to https://dashboard.smappee.net and
check the “Electricity usage” card.
Use a digital multimeter to determine which phase
powers the different loads. Please note that the
colour code inside the fuse box and/or phase
numbering may be incorrect.
0 volt is measured when both loads are on the same phase.