EasyManua.ls Logo

Sofar solar 80KTL - Electrical Connection

Sofar solar 80KTL
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80-136KTL User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
- 29 -
5.Electrical Connection
Outlines of this Chapter
This section introduces the electrical connection for the product. Please read the
information carefully, it may helpful to understand the grounding wiring, DC input
connection, AC output connection and communication connection.
Caution:
Before performing electrical connections, ensure the DC switch is OFF and AC
circuit breaker is OFF. Waiting 5 minutes for the capacitor to be electrically
discharged.
Installation and maintenance should be done by certified electrical
engineer
Attention
Before the electrical connection, use opaque material to cover the PV
modules or disconnect PV string DC switch. PV arrays will produce
dangerous voltage if it is exposure under sun
Danger
For this product, the open circuit voltage of PV strings should not
greater 1100V
Note
5.1 Electrical Connection
Introduce the electrical connection process
5.2 Terminal Port
Introduce inverter terminal port layout
5.3 Grounding Protection (PE)
Connect PE line for grounding protection
5.4 Connect AC outputAC-Output)
Connect AC output for feeding generated electrical into the utility grid. Must meet
the requirement of local utility grid company

Related product manuals