EasyManua.ls Logo

SolarEdge SE7600A-US - Configuring the RS485 Bus for Battery and Meter Connection

SolarEdge SE7600A-US
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.
Insertthecardintothecommunicationboardslotmarked“CARD.
Figure 42: Inserting the upgrade card
4. TurnONthebatteryAUXswitchandcircuitbreaker.Wait1minutebeforeproceeding.
5.
TurnONACtotheinverter.
WARNING!
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the inverter cover is
removed.
RISQUE D’ÉLECTROCUTION, ne touchez pas les fils non isolés lorsque le couvercle de l'onduleur
est retiré.
6. Theupgradestartsautomatically.WaitforthemessageDonetobedisplayedontheLCD.
7. Removethecardfromtheinverter.
Configuring the RS485 Bus for Battery and Meter
Connection
ThissectiondescribeshowtosetuptheRS485communicationbetweentheinverter,
meterandonebattery.
Forinformationonconfiguringtwobatteries,refertotheStorEdgeApplications
ConnectionandConfigurationGuideavailableat
http://www.solaredge.com/sites/default/files/storedge_applications_connection_and_
configuration_guide_na.pdf.
Someinvertersareequippedwithabuilt-inRevenueGradeMeter(RGM),whichislocatedinthe
ConnectionUnit.Whenanadditionalmeterisinstalledfortheseinverters,thesecondmeteris
connectedtotheexistingRGMinadaisychain.
To configure the RS485 bus:
1. TurnOFForverifythattheConnectionUnitswitchisOFF.
2. TurntheinverterON/OFFswitchtoOFF.
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3
82
Configuring the RS485 Bus for Battery and Meter Connection

Table of Contents

Related product manuals