.19..18.
5. Installation5. Installation
A B C D E F
L2
L1
PE
L3
N
Outside-diameters
13~25mm
Cross-section
6~16mm²
60mm
70mm
x
x=9mm
N
L1
L2
L3
5.3.3 Connect grid side of inverter
The steps of AC gird terminal connector for install as follows:
Figure 5.19 AC connector
Figure 5.20 Stripped and bared wire
Figure 5.21 Internal structure of AC connector
Internal of AC connector signs "L1","L2","L3","N" and "PE " five connection
ports (see Figure 5.21). Three live wires are connected the "L1", "L2"and
"L3" terminals respectively; ground wire connects "PE "; neutral wire
connects "N" terminal:
Accessory
AC
connectors
Number
Description
Plastic fixture (Auxiliary installation)
Socket element
Adapter
Seal ring
Seal ring (thick) suit for 12-18mm cable
Fastening case
Swivel nut
Figure 5.22 Connected cable
B) Clip plastic fixture (Auxiliary tighten) in socket element , tighten adapter in socket
element, then tighten swivel nut with 3-4Nm torque (see figure 5.23).
Figure 5.23 Assembly AC terminal
C) Connect AC connector with inverter, then tighten AC connector for clockwise (see figure
5.24), until hearing a slight clicking sound indicates connection succeed.
Figure 5.24 AC connector to inverter
For all AC connections, 6-16mm², YJV-0.6/1KV cable is required to be used. Please make sure the
resistance of cable is lower than 1.50hm. If the wire is longer than 20m, preferred to 10-16mm² cable.
Tighten cable with 3.0 mm allen wrench( focus
in dotted box, see figure 5.22). Allen screw is
easy to drop off, don't screw out completely.
*The combination of AC connectors has two seal rings, please refer to different diameters of cable
select corresponding seal ring.
*
Seal ring (thin) suit for 16-21mm cable
PE
A) Stripped the insulation sleeve of cable for 70mm, so that bared copper-cored connector
reaches for 9mm. Cable through nut and sleeve of socket element, insert corresponding
terminals and tighten with allen wrench (see figure 5.22). Torque is 1.8-2.0Nm.