2-6
SEL1018 (E 4/10-18 OSS) (E 10-18mm F4 OSS)
3. Match the groove of Straight Tube to the Projection of 2 Group Service Assy and assemble them. (three places)
4. Rotate the Straight Tube to the fully counterclockwise direction.
Straight Tube
Grooves
2 Group Service Assy
Projections
HELP08
1. Pass the flexible board of Vibration Proof Service Assy through the hole of 2 Group Service Assy.
2. Tighten the three screws.
Hole
Flexible Board
2 Group Service Assy
Vibration Proof Service Assy
Ver. 1.1 2016.12