14169000-IG, Edition 11.0
January 2018, Original document
15
On-site Deployment
Deployment Tools
Bring the following tools on a site for deployment:
l 1 Spectralink IP-DECT Server 400
l 1 Battery pack min. 8V/max. 60V
l 1 Tripod (app 2m high)
l 1 Cable with RJ45 plug (pin 1 must be connected to pin 3, pin 2 must be connected to pin 6)
Note:
Preferably the tripod shall place the Spectralink IP-DECT Server 400 at the height
where you will place the server/base stations/repeaters in the final installation.
If 2 people perform the deployment at IP-DECT sites, you shall also bring:
l Minimum 1 Spectralink DECT repeater (the repeater must be set up to synchronize on the
Spectralink IP-DECT Server 400 used for the deployment).
l 9V Battery pack
l 1 Tripod (app 2m high)
l 1 Cable to connect battery pack and Spectralink DECT repeater (with RJ11 plug in for the
repeater) For a description of pin connections, see the information on the Power Supply.
Spectralink IP-DECT Server 400/6500 and DECT Server 2500/8000 Synchronization and Deployment Guide