EasyManuals Logo

SPM GT Push 2 User Manual

Default Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #36 background imageLoading...
Page #36 background image
Data di emissione: Dicembre, 2018 Revisione: 2 Pag. : 36/68
- Moisten with water the rear of the tank where
it meets with the seal to facilitate the
reassembling procedures (see fig.24);
- Reassemble the bowl by positioning it back
into its seat, verifying that it faces in the correct
direction and it is held in place by its seal (see
fig.25).
- Fix the bowl by reinsert the knobs (fig.26).
IMPORTANT
Do not over tighten the bowl knobs.
Excessive force could damage the thread
and/or the bowl itself.
- Re-insert the tap (fig.27) spreading Vaseline
on the o-rings to facilitate sliding the tap in its
seat until completely inserted.
!Warning!
If the tap does not perfectly slide into position,
the sealing hold will be endangered.
- Reassemble the accessory to give a “star”
peculiar shape to the dispensed product.
- Reassemble the drip tray.
- Once cleaned, before starting up the machine
perform the sanitizing procedure as described in
the next page.
Fig. 24
Fig. 25
Fig. 26
Fig. 27

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SPM GT Push 2 and is the answer not in the manual?

SPM GT Push 2 Specifications

General IconGeneral
BrandSPM
ModelGT Push 2
CategoryIce Cream Maker
LanguageEnglish

Related product manuals