5 Commissioning and testing
20 10.20133
BA_SLE22_EN.DOCX
5.3 Documenting alterations of cut-off point
DANGER
off point, it must be documented, confirmed and signed in the lid
of the case, in the following table and in the crane logbook.
Any undocumented alteration of the cut-off point leads to an immediate loss of warranty
and is grossly negligent.
user
service engi-
neer