COMMISSIONING CHECK LIST
6
FLUE SYSTEM PASS FAIL
1. Flue Routing in compliance with Guidelines (see Flue Installation)
2. Waterford Stanley Flue Pipes & Fittings Used.
3. Flue Terminal positioned correctly & clear of obstructions.
LOCATION PASS FAIL
1.Clearance to combustible materials must be adhered to (see Clearance
to Combustible section).
2. Floor Protection extends 100mm in front, 200mm to sides & 100mm from
back.
3. Clearance must be maintained to allow for maintenance and part
replacement.
GAS CHECK PASS FAIL
1. Gas Soundness Test
2. Inlet Gas Pressure mbar
3. Burner Pressure mbar
OPERATIONAL CHECK PASS FAIL
1. Spillage Test
2. Remote Control Operation
3. Pilot Ignition Check
4. Main Burner Check
5. Customer advised on use of the Stove
SAFETY CHECK PASS FAIL
1. CO Alarm Fitted
PRODUCT & INSTALLER INFORMATION
MODEL:
SERIAL NO:
GAS TYPE:
DATE OF
PURCHASE:
INSTALLER:
CONTACT NO:
RGI/ GAS SAFE
REGISTRATION
NO:
DATE OF
INSTALL: