EasyManua.ls Logo

Stanley ProSert XTN20 - Operating Procedure; Installing a Blind Rivet Nut

Stanley ProSert XTN20
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Operating Procedure
Installing a Blind Rivet Nut (see Fig. 3).
To install a Blind Rivet Nut.
Check that the correct Blind Rivet Nut has been selected.
Push Blind Rivet Nut into the application.
Check Nose Assembly is at right angle (90°) to the work.
Push onto the Blind Rivet Nut with the tool to spin on.
Once fully and correctly inserted, depress tool Trigger 20 switch to start installation cycle.
Hold the Trigger 20 until the Blind Rivet Nut is completely set and the tool has disengaged completely.
In the event a Blind Rivet Nut becomes jammed in an application press the Manual Reverse Trigger 17 to
reverse the Mandrel 1 and spin o the Blind Rivet Nut. Alternately disconnect from the air supply and use the
4mm Pin Punch 21 supplied in the Maintenance Kit to wind o the Mandrel through the Nose Casing 4 shown
in the gure 1.
CAUTION - do not attempt to force the installation of an insert as this will cause damage to the tool and/or
application.
15
ENGLISH

Table of Contents

Other manuals for Stanley ProSert XTN20

Related product manuals