EasyManua.ls Logo

stellar labs 9628 - Page 52

Default Icon
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 8 - Hydraulics/Elecrical
8-6
Hydraulic Installation
1. After mounting, locate the pressure and
return lines. Note: Pressure line is 3/8”
hose; Return line is 1/2” hose. Hoses are
terminated using swivel fittings.
2. Install hydraulic lines per diagram below.
Note: Outrigger valve supplies oil to crane
using the Power Beyond feature.
3. Install hydraulic reservoir with return filter.
Attach pump pressure line to valve, return
link to tank.
4. Fill system with hydraulic oil (Mobil DTE-
13M is recommended).

Related product manuals