3315 Telescopic Crane
Manual Part No. 31705
Last Revision: 10/10/09
Subject to Change without Notification.
© 2009 Stellar Industries, Inc.
Safety, Installation, Maintenance, and Operation
OWNERS MANUAL
3315
21163

Table of Contents

Questions and Answers

  • M
    Maria RiceAug 17, 2025
    What to do if stellar labs 3315 Construction Equipment transmitter is transmitting, but crane won't respond?
    • C
      Claudia FarrellAug 17, 2025
      If the Stellar Labs Construction Equipment transmitter is transmitting but the crane isn't responding, ensure the E-Stop push button is released. Also, verify that the transmitter is within the receiver's operational range. Check if the receiver is powered on. Finally, inspect the E-Stop pushbutton for any damage or wiring issues, repairing or replacing as necessary.
  • R
    Ronald WoodAug 20, 2025
    Why won't my Stellar Labs Construction Equipment system operate after start-up?
    • A
      Albert HoweAug 20, 2025
      If the Stellar Labs Construction Equipment system won't operate after the normal start-up, first, check that the E-Stop switch is disengaged by pulling it out. Next, verify the batteries are fully charged, replacing them if needed. Finally, confirm the receiver is receiving power by checking the diagnostic LED and ensure the system is properly grounded.
  • S
    smithtimothyAug 22, 2025
    How to fix intermittent crane motions on stellar labs 3315 Construction Equipment?
    • J
      jennifervargasAug 23, 2025
      If all crane motions on your Stellar Labs Construction Equipment operate intermittently, check if the receiver antenna is loose or missing, and tighten or replace it as needed. If using an external antenna, ensure it has a tight connection and proper grounding, and check for any interference. Also, make sure the ground wiring is correctly connected to the machine power source ground, using a minimum 12 AWG conductor diameter, not grounded to the chassis.
  • L
    lopezarielAug 25, 2025
    Why Stellar Labs Construction Equipment crane will not operate?
    • M
      Matthew TuckerAug 26, 2025
      The crane may not operate because the parking brake is not engaged, or the PTO is not engaged. Ensure the transmitter batteries are fully charged. Also, ensure there is 12V power going to the radio receiver, and if not, trace back to the power source to check for a blown fuse or loose ground connection. Check that the hydraulic pump is operating at its rated flow (GPMs); if the pump is weak, contact Stellar Customer Service.
  • M
    Matthew RiosAug 27, 2025
    What to do if stellar labs 3315 Construction Equipment crane operates slowly?
    • B
      Bryan VelasquezAug 27, 2025
      If the crane operates slowly, ensure it is receiving the recommended hydraulic flow. Check the hydraulic fluid level in the reservoir and add fluid if needed. Also, check the hydraulic fluid temperature. Make sure the proportional valve is receiving 12V power when fully engaging the transmitter trigger; if not, check for loose connections inside the transmitter or replace the handle trigger assembly. The valve bank orifice may be plugged; if so, replace it and call Stellar Customer Service for instructions.
  • T
    tiffanykimAug 30, 2025
    What to do if stellar labs 3315 crane only operates at full speed?
    • L
      lfuentesAug 30, 2025
      If the crane only operates at full speed, check to see if there is 12V power constantly going to the proportional valve. If 12 volts are present at the proportional valve without pulling on the transmitter trigger, the system handle/trigger assembly may be defective. Also, check if the manual override on the proportional valve is turned out; turn the manual override on the flow valve in. If 8 volts are present at the proportional valve, the valve may be stuck open and will not close; remove the valve, clean it thoroughly, and reinstall.
  • R
    rharrisonSep 1, 2025
    How to troubleshoot stellar labs 3315 crane that operates manually but not by radio remote?
    • J
      Jason BrockSep 1, 2025
      If the crane operates manually but not by radio remote, first, ensure there is 12V power going to the radio receiver. If there is no power, trace back to the power source and check for a blown fuse or loose ground connection. Make sure that the parking brake is engaged and that the parking brake switch is working properly by performing a continuity test; if the switch is defective, replace it.
  • V
    victoriaserranoSep 4, 2025
    What to do if stellar labs 3315 Construction Equipment cylinder drifts outward or downward?
    • N
      Natasha HayesSep 4, 2025
      If the cylinder drifts outward or downward, check to see if there is air in the hydraulic system by operating all cylinders connected to the hydraulic system. Also, make sure the holding valves are operating properly. Remember to relieve hydraulic oil pressure from all hydraulic circuits before performing any maintenance on hydraulic components.
  • X
    xwilsonSep 6, 2025
    What to do if Stellar Labs Construction Equipment winch will not hold load?
    • J
      Jenna MckinneySep 7, 2025
      If the winch will not hold a load, ensure the lifted object does not exceed the winch's rated capacity, referring to the capacity chart. Also, verify the limit switch is working correctly by disconnecting and tying together the two wires connected to it; if all functions then operate, replace the limit switch. Additionally, ensure the relief valve on the winch is set correctly and readjust it if necessary.
  • B
    Brenda CraigSep 9, 2025
    What to do if not all stellar labs 3315 crane functions operate using the radio remote transmitter or crane operates intermittently?
    • P
      Pamela HowardSep 9, 2025
      If not all crane functions operate using the radio remote transmitter, or if the crane operates intermittently, ensure the toggle switch is working properly and replace it if defective. Also, check that there is power going to the valve bank coil solenoid of the function that will not operate. If no power is going to the coil solenoid, check wiring connections on the wire harness plug connector for broken wires, loose connections, or poor crimps. If power is present, the solenoid valve may not be opening; remove the stem valve, thoroughly clean, lubricate, and reinstall it, being careful not to overtighten. Replace the valve if it will not close.

Summary

Owners Manual

Manual Scope

Covers safety, installation, maintenance, and operation of the crane.

Crane Model

Details specific to the 3315 Telescopic Crane model.

Chapter 1 - Safety

General Safety Guidelines

Fundamental safety principles for crane operation and responsibility.

Personal Safety Precautions

Protective measures for operators and personnel in the work area.

Maintenance Safety Rules

Safety procedures to follow during maintenance and repair.

Stability and Load Safety

Ensuring stable operation and safe load handling practices.

Electrocution and Environmental Hazards

Precautions against electrical hazards and environmental factors.

Chapter 2 - Operation

Job-Site Set-Up Procedures

Steps for correctly positioning the vehicle and preparing the work site.

Crane Controls Overview

Familiarization with crane control functions and operation.

Crane Operation Steps

Detailed steps for engaging PTO, operating the crane, and disengaging.

Crane and Hook Precautions

General operational precautions and specific safety for hook usage.

Load Handling Procedures

Guidelines for attaching, moving, and securing loads safely.

Chapter 3 - Maintenance

Maintenance Safety Warning

Critical safety notice before performing any maintenance.

Daily Inspection Checklist

Items to inspect daily before operating the crane.

Chapter 4 - Specifications

Capacity Chart

Visual load capacity chart for various reaches and angles.

Chapter 5 - Decals

Chapter 6 - Installation

Stability Testing Procedure

Method for testing crane stability and determining load capacities.

Chapter 9 - Replacement Parts

Chapter 10 - Troubleshooting

Crane Will Not Operate

Solutions for when the crane fails to operate.

Manual Operation OK, Electrical Fails

Troubleshooting steps when manual operation works but electrical does not.

Intermittent Crane Functions

Solutions for crane functions that operate intermittently.

Winch Load Holding Issues

Troubleshooting steps for when the winch brake does not hold the load.

Cylinder Drift Problems

Solutions for cylinders drifting outward or downward.

Specific Function Failures

Troubleshooting for winch, main, and extension cylinder operations.

Slow Crane Operation

Solutions for when the crane operates at a slow speed.

5 Function Hetronic Radio Remote Troubleshooting

Troubleshooting guide for the 5-function Hetronic radio remote system.

6 Function Hetronic Radio Remote Troubleshooting

Troubleshooting guide for the 6-function Hetronic radio remote system.