EasyManua.ls Logo

Stephan VCM 44 - Maintenance Work for 8 Hour Operation Maintenance Work

Default Icon
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Daily cleaning and maintenance
31.10.2002 \\Docuserver\ba\Master\Ba_eng\UM\044_60\UM_A+S\Tglrein.fm 17
VCM 44
6.2 Maintenance work for 8 hour operation Maintenance work
When? Where? What to check... ...and what to do. Page
Daily Shaft seals of the bowl/motor Sight control of leakage once
daily and after every cleaning
24
Bowl and lid Seals and running sleeves in the bowl replace damaged seals
clean running sleeves and re-
place them if wear is noticeable
on the upper surface.
24
working in-
serts
working inserts must be sharp and un-
damaged, if not,
they should be replaced.
Blades should be sharpened.
(See ” Sharpening the blades”
on page 24.)
19