Maintenance
31.10.2002 \\Docuserver\ba\Master\Ba_eng\UM\044_60\UM_A+S\Wartung.fm 24
VCM 44 A
9. Maintenance
9.1 Sharpening the blades
Only sharpened blades should be installed. Blunt blades must be sharpened on special blade
grinding machines. Blades should be wet-ground to prevent oxidation or drawing temper. Burrs
should be removed wet with a whetstone.
9.2 Changing the seals
If the machine may run under vacuum conditions, the pressure chamber must always be her-
metically sealable. Leakage to the motor bearing shield may damage the motor. Therefore, the
seals must be checked and cleaned daily.
Damaged seals must be replaced immediately. The running sleeve should be carefully
cleaned at the same time. Should traces of broaching be detected, the running sleeves should
also be replaced.
9.2.1 Construction of the motor shaft seal, standard
Shaft seal bowl/motor
Should competent grinding work not be possible on site, blades may be sent to
Stephan for regrinding.
Pos. No. Description Part No.
2 Sealing flange, complete 3K1012-03