EasyManua.ls Logo

Stihl RMI 522 C - Installing the Docking Station

Stihl RMI 522 C
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN
27
0478 131 8365 C - EN
9.7 Setting the language, date and time
Pressing any button on the display
activates the machine and thus the
installation assistant.
Select the required display language
and confirm with the OK button.
Confirm your language selection
with the OK button or select
"Change" and repeat the language
selection.
If necessary, enter the 9-digit serial
number of the robotic mower. This
number is printed on the identification
plate (see Machine overview). (Ö 3.)
Set the current date using the
control pad and confirm with the OK
button.
Set the current time using the
control pad and confirm with the OK
button.
9.8 Installing the docking station
Connect the power cable to the docking
station. (Ö 9.3)
Route the power cable under the floor
plate when the docking station is
installed at a wall. (Ö 9.1)
Fix the docking station (B) into position at
the chosen location using four pegs (E).
Install the power supply unit outside the
mowing area, protected from direct
sunlight, humidity and moisture – fasten
to a wall if necessary.
Read the "Notes on the docking
station" section (Ö 9.1) and study
the installation examples (Ö 26.) in
this instruction manual.
Note:
Drive the pegs into the ground in
such a way that the docking station
floor plate does not bend.

Table of Contents

Related product manuals