EasyManua.ls Logo

Store It Cold CoolBot PRO - Page 16

Store It Cold CoolBot PRO
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WWW.STOREITCOLD.COM
SUPPORT@STOREITCOLD.COM
16
2019 © Store It Cold, LLC. Rev 2019-04A All Rights Reserved.
Nail together the four boards that make up the AIR CONDITIONER FRAME and then nail the
frame to the adjacent STUDS.
Rotate the entire back wall frame 180˚ and place the BOTTOM PLATE against the backstop.
Nail the TOP PLATE to the STUDS using two nails into each STUD.
Align the TOP DOUBLE PLATE centered on the TOP PLATE which will leave 3-1/2" overhang on
each side. A 2x4 lying flat on the ground is a good reference for the required overhang
Nail the TOP DOUBLE PLATE to the TOP PLATE with nails approximately every 12" staggered side
to side.
The back wall is now complete.

Other manuals for Store It Cold CoolBot PRO

Related product manuals