WWW.STOREITCOLD.COM
SUPPORT@STOREITCOLD.COM
16
2019 © Store It Cold, LLC. Rev 2019-04A All Rights Reserved.
• Nail together the four boards that make up the AIR CONDITIONER FRAME and then nail the
frame to the adjacent STUDS.
• Rotate the entire back wall frame 180˚ and place the BOTTOM PLATE against the backstop.
• Nail the TOP PLATE to the STUDS using two nails into each STUD.
• Align the TOP DOUBLE PLATE centered on the TOP PLATE which will leave 3-1/2" overhang on
each side. A 2x4 lying flat on the ground is a good reference for the required overhang
• Nail the TOP DOUBLE PLATE to the TOP PLATE with nails approximately every 12" staggered side
to side.
The back wall is now complete.